The Port Authority of Huelva has awarded Ferrovial Construction the remodeling of the berthing facilities for Ferries and roll-on roll-off cargo vessels located at the South Quay, consisting of the installation of a new Ro-Ro ramp, as well as the construction of all the necessary infrastructures for the optimal operation of the planned fleet.
The new RoRo pontoon will be built at Nuevo Astillero de Huelva, which has entrusted ALTUM with the design of the floating craft.
It is a 50×28 meter rectangular floating steel structure, moored to two new Duques de Alba, which are founded on three 1.5 meter diameter piles, and are located between the new fixed access platform and the quay edge line.
Empresa de consultoría e ingeniería, que ofrece los más diversos servicios en el ámbito del sector marítimo y naval.