In collaboration with ASTILLEROS ARMÓN, ALTUM carries out the conceptual and basic engineering project for the new freezer trawler that BALTIMAR will build in the Navia factory.Read More
The objective of the IFMIF-DONES project is to build a neutron source to test, validate and qualify materials to be used in future fusion power plants as a DEMO (a prototype demonstration fusion reactor).Read More
ALTUM has been contracted to perform the various risk analyses that are required by the classification society (Lloyds Register) for several of the ship's class notations.Read More
ARGO is Acciona's proposal to industrialize the foundation process for offshore wind turbines and contribute to the promotion of this type of installation, generating local employment, reducing execution times and minimizing labor risks by reducing the number of offshore operations.Read More
The Oil Spill Response Vessel (OSRV) is 12.5 meters long and 4.2 meters wide and is currently in the outfitting phase after completion of aluminum and paint work.Read More
Recent Comments